County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
The team at Curtis Furniture have supported us with 1,000+ key refurbishment projects over the past three years. The projects have been delivered at speed, with concurrent phases across a national portfolio of hotels, and the quality of case goods and loose furniture has remained consistently high. We trust Curtis to align with our standards of excellence, particularly in respect of quality and sustainability. We also know that, if and when projects throw up issues, we can rely on the team to respond swiftly and proactively."
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."
County worked with Curtis on the recent renovation of 301 bedrooms at the Delta by Marriott in Bristol city centre. The renovation took place over 10 phases whilst the hotel was in operation. From start to finish this refurbishment project was managed by our project management team and the Curtis dedicated project management team who went above and beyond to ensure the project ran smoothly and to schedule. We have worked with Curtis on many projects and will continue to do so in future."
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
I have worked with Curtis many times. The projects have spanned small refurbishments, to the full refit of the 312 room Belfry Hotel. They are always supportive and passionate about the projects from the initial conversations, right through to their on-site installation."