our projects
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
Barton Minty have engaged Curtis Furniture on several hotel projects, across a wide variety of brands and locations. As with most large scale hotel refurbishment, all have had their own specific challenges. The team at Curtis were always able to find solutions, resulting in delivery and installation of long lasting furniture."
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."
Having partnered with Curtis Furniture on previous projects in the UK, we were pleased to appoint them as the bedroom furnishings supplier for Seaton House and Dunluce Lodge. Their meticulous attention to detail throughout the planning and manufacturing processes was greatly appreciated. They executed the design vision of each property flawlessly, while ensuring each remained distinctive.
Curtis manufactured bespoke furniture for 60 bedrooms at the prestigious St Andrews’ Old Course Hotel, Golf Resort & Spa. The hotel remained open throughout its multi-million pound refurbishment which meant that Curtis had to ensure the manufacture process ran smoothly and on time. Curtis’s experience in delivering hotel refurbishment projects enabled us to complete the project on time ahead of the Open."
Curtis manufactured 312 rooms of high quality, bespoke bedroom furniture for The Tribe hotel. Communication was speedy and consistent, and the furniture received was of high quality and offered excellent value for money. Due to the scale of the project there were changes and issues which Curtis helped us to overcome. I look forward to working with Curtis on further projects in the future.
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."