what our clients say about us
we are trusted by prestigious clients
We have lots of lovely clients, some of whom have been with us for over 20 years.
The quality of our service and longevity of our furniture means that our clients come back time and time again.
what our clients say about us
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."
Jonathan Kell /
Director
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
Colin London /
Associate Partner
We recently completed a significant renovation at the Hilton Leeds City, focusing on upgrading our guestrooms. Curtis played a pivotal role in this transformation by supplying high-quality case goods in collaboration with Bell & Swift.
From the initial consultation to the final installation, the team at Curtis demonstrated exceptional professionalism and attention to detail. Their expertise ensured that each piece perfectly complemented our design vision, enhancing the overall guest experience.
Curtis's commitment to excellence and their ability to meet our tight deadlines made the entire process seamless and stress-free. We are incredibly pleased with the results and would highly recommend Curtis Furniture.
Christopher Stafford /
Director (Commercial)
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
Martin McColl /
Managing Director
The team at Curtis were integral to the magnificent refurbishment of The Queens Hotel in Leeds. All the bedrooms were transformed plus 17 new added, bringing the room total to 232 including a Presidential Suite. Curtis’s designers helped to achieve the art-deco inspired interiors. Choosing Curtis offered huge advantages from the initial consultations and site visits, right though to delivery and installation."
Kristy Unger /
Senior Designer
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
Rachael Sheldon /
Senior Designer
Curtis manufactured bespoke furniture for 60 bedrooms at the prestigious St Andrews’ Old Course Hotel, Golf Resort & Spa. The hotel remained open throughout its multi-million pound refurbishment which meant that Curtis had to ensure the manufacture process ran smoothly and on time. Curtis’s experience in delivering hotel refurbishment projects enabled us to complete the project on time ahead of the Open."
Scott McCroskery /
Project Manager
Curtis manufactured 312 rooms of high quality, bespoke bedroom furniture for The Tribe hotel. Communication was speedy and consistent, and the furniture received was of high quality and offered excellent value for money. Due to the scale of the project there were changes and issues which Curtis helped us to overcome. I look forward to working with Curtis on further projects in the future.
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
Craig McKie /
Creative Director
Sharkey UK worked with Curtis on The Schloss Roxburghe to create the modern, elegant bedrooms in the new Estate House. Curtis manufactured and installed the luxurious fittings and fixtures to an excellent standard. The project was expertly managed from start to finish from design work to manufacture, with quick and easy communication which helped the project run smoothly. We have worked with Curtis on many projects and will continue to do so in the future."
Scott Henry /
Project Manager
Having partnered with Curtis Furniture on previous projects in the UK, we were pleased to appoint them as the bedroom furnishings supplier for Seaton House and Dunluce Lodge. Their meticulous attention to detail throughout the planning and manufacturing processes was greatly appreciated. They executed the design vision of each property flawlessly, while ensuring each remained distinctive.
Paige Harris /
Vice President of Architecture & Design
“Much of a Hotel Indigo’s retelling of their individual neighbourhood story is achieved through design, weaving in local themes and references, thus demanding bespoke, considered solutions rather than standard off-the-peg options. Curtis’ genuine interest in the successful execution of the brief, giving nods to the local goldsmiths, architects and horologists, was both reassuringly productive and also refreshing. The initial expectations from us, the client, did not encompass the flexibility, time and grace that the Curtis team utilised, allowing the successful navigation around the preliminary value engineering and design adaptation demands, nor did we predict the continuation of this additional layer of client support which transpired to be pivotal to dissolving several unexpected hurdles which emerged as the build progressed.”
Nick Boland /
Head of Business Operations