County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
The team at Curtis were integral to the magnificent refurbishment of The Queens Hotel in Leeds. All the bedrooms were transformed plus 17 new added, bringing the room total to 232 including a Presidential Suite. Curtis’s designers helped to achieve the art-deco inspired interiors. Choosing Curtis offered huge advantages from the initial consultations and site visits, right though to delivery and installation."
The team at Curtis Furniture have supported us with 1,000+ key refurbishment projects over the past three years. The projects have been delivered at speed, with concurrent phases across a national portfolio of hotels, and the quality of case goods and loose furniture has remained consistently high. We trust Curtis to align with our standards of excellence, particularly in respect of quality and sustainability. We also know that, if and when projects throw up issues, we can rely on the team to respond swiftly and proactively."
County worked with Curtis on the recent renovation of 301 bedrooms at the Delta by Marriott in Bristol city centre. The renovation took place over 10 phases whilst the hotel was in operation. From start to finish this refurbishment project was managed by our project management team and the Curtis dedicated project management team who went above and beyond to ensure the project ran smoothly and to schedule. We have worked with Curtis on many projects and will continue to do so in future."
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
Curtis manufactured 312 rooms of high quality, bespoke bedroom furniture for The Tribe hotel. Communication was speedy and consistent, and the furniture received was of high quality and offered excellent value for money. Due to the scale of the project there were changes and issues which Curtis helped us to overcome. I look forward to working with Curtis on further projects in the future.
"We partnered with Curtis for the refurbishment of 34 executive rooms and suites as part of the first phase of our upgrade at Vale Resort, and the experience was good from start to finish.
Working directly with their team, we found Curtis to be professional, responsive and highly collaborative throughout the process. The furniture was manufactured and installed to a high standard, with great attention to detail. The finished rooms have elevated the look and feel of our executive offering, delivering the quality and comfort our guests expect. We would be happy to recommend the team at Curtis.”