Curtis helped us to achieve the stunning aesthetic of Malmaison Manchester Deansgate. Working to drawings and moodboards from Koncept design, they made the furniture and fittings as we had envisioned. The details and quality absolutely align with the craftsmanship that we’d expect from Curtis and the style credentials of Malmaison."
Curtis completed the design, supply and installation of the bedroom FF&E at the new Hilton Garden Inn hotel extension at our Lancashire County Cricket Club project. From pre-construction through to installation, the team have been a pleasure to deal with. They were helpful and their knowledge of the Hilton Brand Standard products has been invaluable to the project."
We have worked with the team at Curtis for over 20 years and on various hotel brands and private owners. They respond promptly when design information is issued and provide detailed quotations. They are also proactive when helping to resolve budgets or programme issues which arise. Their UK factory enables them to provide high quality furniture and to be flexible in meeting the challenges of large and complex installations."
Sharkey UK worked with Curtis on The Schloss Roxburghe to create the modern, elegant bedrooms in the new Estate House. Curtis manufactured and installed the luxurious fittings and fixtures to an excellent standard. The project was expertly managed from start to finish from design work to manufacture, with quick and easy communication which helped the project run smoothly. We have worked with Curtis on many projects and will continue to do so in the future."
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
To avoid the risks of shipping from outside the UK, we wanted to select a British Manufacturer, and Curtis are one of the few with the capacity to supply bespoke case goods for 1,000 rooms over a 12-month project. Our relationship with Curtis goes back over 20 years. We needed to choose an expert partner we could trust to turn around the room refurbishments in a timely manner and with minimal disruption, as the hotel remained fully operational throughout."
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.