our projects
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
To avoid the risks of shipping from outside the UK, we wanted to select a British Manufacturer, and Curtis are one of the few with the capacity to supply bespoke case goods for 1,000 rooms over a 12-month project. Our relationship with Curtis goes back over 20 years. We needed to choose an expert partner we could trust to turn around the room refurbishments in a timely manner and with minimal disruption, as the hotel remained fully operational throughout."
We recently completed a significant renovation at the Hilton Leeds City, focusing on upgrading our guestrooms. Curtis played a pivotal role in this transformation by supplying high-quality case goods in collaboration with Bell & Swift.
From the initial consultation to the final installation, the team at Curtis demonstrated exceptional professionalism and attention to detail. Their expertise ensured that each piece perfectly complemented our design vision, enhancing the overall guest experience.
Curtis's commitment to excellence and their ability to meet our tight deadlines made the entire process seamless and stress-free. We are incredibly pleased with the results and would highly recommend Curtis Furniture.
Sharkey UK worked with Curtis on The Schloss Roxburghe to create the modern, elegant bedrooms in the new Estate House. Curtis manufactured and installed the luxurious fittings and fixtures to an excellent standard. The project was expertly managed from start to finish from design work to manufacture, with quick and easy communication which helped the project run smoothly. We have worked with Curtis on many projects and will continue to do so in the future."
Curtis completed the design, supply and installation of the bedroom FF&E at the new Hilton Garden Inn hotel extension at our Lancashire County Cricket Club project. From pre-construction through to installation, the team have been a pleasure to deal with. They were helpful and their knowledge of the Hilton Brand Standard products has been invaluable to the project."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
“Much of a Hotel Indigo’s retelling of their individual neighbourhood story is achieved through design, weaving in local themes and references, thus demanding bespoke, considered solutions rather than standard off-the-peg options. Curtis’ genuine interest in the successful execution of the brief, giving nods to the local goldsmiths, architects and horologists, was both reassuringly productive and also refreshing. The initial expectations from us, the client, did not encompass the flexibility, time and grace that the Curtis team utilised, allowing the successful navigation around the preliminary value engineering and design adaptation demands, nor did we predict the continuation of this additional layer of client support which transpired to be pivotal to dissolving several unexpected hurdles which emerged as the build progressed.”
Curtis recently worked with ourselves on a fast paced 274 bedroom refurbishment in the iconic Hilton Park Lane, London. From initial design stage Curtis provided an efficient service, producing drawings in a timely fashion, and nothing was an issue for them…even though this process ate into the Christmas holiday season!
From the delivery of materials, control of quality and the install process, Curtis once again provided an excellent service, leaving minimal defects or issues. They also proved extremely flexible with their approach, thus allowing us to complete the project 2 weeks in advance of the contracted handover which is a great achievement for all involved.
We would have no hesitation in using Curtis again for future projects."
"We partnered with Curtis for the refurbishment of 34 executive rooms and suites as part of the first phase of our upgrade at Vale Resort, and the experience was good from start to finish.
Working directly with their team, we found Curtis to be professional, responsive and highly collaborative throughout the process. The furniture was manufactured and installed to a high standard, with great attention to detail. The finished rooms have elevated the look and feel of our executive offering, delivering the quality and comfort our guests expect. We would be happy to recommend the team at Curtis.”