To avoid the risks of shipping from outside the UK, we wanted to select a British Manufacturer, and Curtis are one of the few with the capacity to supply bespoke case goods for 1,000 rooms over a 12-month project. Our relationship with Curtis goes back over 20 years. We needed to choose an expert partner we could trust to turn around the room refurbishments in a timely manner and with minimal disruption, as the hotel remained fully operational throughout."
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
"We partnered with Curtis for the refurbishment of 34 executive rooms and suites as part of the first phase of our upgrade at Vale Resort, and the experience was good from start to finish.
Working directly with their team, we found Curtis to be professional, responsive and highly collaborative throughout the process. The furniture was manufactured and installed to a high standard, with great attention to detail. The finished rooms have elevated the look and feel of our executive offering, delivering the quality and comfort our guests expect. We would be happy to recommend the team at Curtis.”
I have worked with Curtis many times. The projects have spanned small refurbishments, to the full refit of the 312 room Belfry Hotel. They are always supportive and passionate about the projects from the initial conversations, right through to their on-site installation."
Curtis manufactured bespoke furniture for 60 bedrooms at the prestigious St Andrews’ Old Course Hotel, Golf Resort & Spa. The hotel remained open throughout its multi-million pound refurbishment which meant that Curtis had to ensure the manufacture process ran smoothly and on time. Curtis’s experience in delivering hotel refurbishment projects enabled us to complete the project on time ahead of the Open."
The team at Curtis Furniture have supported us with 1,000+ key refurbishment projects over the past three years. The projects have been delivered at speed, with concurrent phases across a national portfolio of hotels, and the quality of case goods and loose furniture has remained consistently high. We trust Curtis to align with our standards of excellence, particularly in respect of quality and sustainability. We also know that, if and when projects throw up issues, we can rely on the team to respond swiftly and proactively."
Barton Minty have engaged Curtis Furniture on several hotel projects, across a wide variety of brands and locations. As with most large scale hotel refurbishment, all have had their own specific challenges. The team at Curtis were always able to find solutions, resulting in delivery and installation of long lasting furniture."
We have worked with Curtis on many hotels and I am pleased to say that, yet again, they performed well on our latest project for Ember Locke in Kensington. They manufactured 120 kitchens for our project and were a great support in engineering and designing kitchens which worked across the many challenging room types in this beautiful period building. The deliveries were communicated by a dedicated project manager and the furniture arrived on time for what was a challenging multi phased programme."