our projects
We have worked with the team at Curtis Furniture on multiple hotel projects and for over 10 years. The Marriott Kensington was, like many of our previous hotel projects, both large and complex. We know from experience that Curtis make an excellent product, however it is their communication and flexibility that sets them apart.
They provide a dedicated project manager and installation manager to each job, providing a quick responsive team who work with us throughout both the manufacture and installation of the furniture. We would not hesitate in recommending Curtis."
I have worked with Curtis many times. The projects have spanned small refurbishments, to the full refit of the 312 room Belfry Hotel. They are always supportive and passionate about the projects from the initial conversations, right through to their on-site installation."
Barton Minty have engaged Curtis Furniture on several hotel projects, across a wide variety of brands and locations. As with most large scale hotel refurbishment, all have had their own specific challenges. The team at Curtis were always able to find solutions, resulting in delivery and installation of long lasting furniture."
We have worked with the team at Curtis for over 20 years and on various hotel brands and private owners. They respond promptly when design information is issued and provide detailed quotations. They are also proactive when helping to resolve budgets or programme issues which arise. Their UK factory enables them to provide high quality furniture and to be flexible in meeting the challenges of large and complex installations."
To avoid the risks of shipping from outside the UK, we wanted to select a British Manufacturer, and Curtis are one of the few with the capacity to supply bespoke case goods for 1,000 rooms over a 12-month project. Our relationship with Curtis goes back over 20 years. We needed to choose an expert partner we could trust to turn around the room refurbishments in a timely manner and with minimal disruption, as the hotel remained fully operational throughout."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
County worked with Curtis on the recent renovation of 301 bedrooms at the Delta by Marriott in Bristol city centre. The renovation took place over 10 phases whilst the hotel was in operation. From start to finish this refurbishment project was managed by our project management team and the Curtis dedicated project management team who went above and beyond to ensure the project ran smoothly and to schedule. We have worked with Curtis on many projects and will continue to do so in future."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.